Chi tiết dự án

Dong Anh Base Depot

The Project has a comprehensive infrastructure with full necessary work items including covered and outdoor warehouses, control building and other support items, divided into the following major functional areas:

No.
Contents
Area (m2)
Percentage
  Total Project Land
Including:
23.492
100%
1 Control Building
1.053
4.48%
2
Warehouses
14.514
61.9%
  Including:
   

- Covered Warehouses
5.850


- Outdoor Warehouses
8.692
3
Technical Infrastructure
295 1.26%
4
Traffic
3.962 16.87%
5
Green
3.641 15.50%
6
Project Implementation Duration : 2007 - 2009
7
Project Exploitation Duration: 50 years

The Project helps to provide parking, construction material and equipment stockpiling, and to serve local civil engineering and industrial works, in line with the general orientation of Hanoi City.

Total Project Investment: VND 27 billion

Constrexim Housing Development and Investment Joint-Stock Company
Add.: 4th Fl., HH1 Building, Cau Giay New Urban Area, Yen Hoa Ward, Cau Giay District, Hanoi
Tel.: 844-378 22816      Fax: 844-378 22815      Email: info@constreximhod.com.vn
© 2011 Constrexim-HOD. All rights reserved. Designed by Digivision.
Tổng số lượt truy cập: 832873
Số khách đang truy cập: 54